A field survey is where drawings meet the actual jobsite. It confirms dimensions, identifies conditions that affect production or installation, and turns an estimate or design concept into information the field and production teams can use.

The survey starts by matching rooms, elevations, openings, walls, doors, and surfaces to the current drawings. The estimator notes additions, deletions, substitutions, and conflicts so the measured scope reflects what is actually being built.
Glass lites, walls, doors, frames, and other application areas are measured and labeled. For multi-panel graphics, the survey records mullions, gaps, returns, corners, door swings, hardware, and the intended continuation of the design. Dimensions are tied to photographs or opening numbers to reduce production ambiguity.

The survey looks for existing film, coatings, texture, damaged drywall, peeling paint, sealant, gaskets, scratches, moisture, unstable finishes, and other conditions that may affect adhesion or appearance. It also identifies prep work that belongs to MetWest, another trade, or the owner.
Access can change labor and schedule. The estimator documents ceiling height, stairs, lifts, scaffolding, loading, parking, security, badging, furniture, restricted hours, occupied areas, floor protection, and conflicts with other trades. These items belong in the installation plan and price.
A field survey does not approve artwork, choose colors, authorize scope changes, or guarantee that unfinished construction will remain unchanged. Final production still depends on approved elevations, samples or strike-offs, artwork, substrate readiness, and written direction from the responsible parties.
MetWest connects field measurements, photographs, production files, elevations, project management, and installation. The survey is not a formality; it is the point where the team reduces assumptions before material is produced.
No Comments